Lay out the
poles & Fittings (screws facing up) in the shape of
the Sukkah,
Then insert poles into fittings, without blocking the
hole for the upright, then tighten screws with the hex
key till tight. |
|
|
|
Insert
uprights into fittings till flush with the floor,
and then tighten screws. |
|
| |
|
Attach
top fitting about 1 ½ inch down on the pole
(fittings can be moved up or down to tighten or
loosen canvas), and
then tighten screw until tight. |
|
|
|
|
Insert the
(D) pole through door fitting (H) and tighten, then insert
the (B) pole through the Fitting (H) don't tighten before
attaching canvas. |
|
|
|
First insert
the (B) poles into fittings and tighten, then insert the
(C) poles into fittings, and tighten. |
|
|
|
Unroll the
canvas. On the top section (Lighter) there are gold grommets.
Start with the corner of the canvas with the zipper, place
the grommet over the pole,
and push down till the fitting. Going counter clockwise
towards the back wall of the Sukkah. |
|
|
|
Continue round
the Sukkah till reaching the door. Adjust the door fitting
(H) to the correct position for the door and tighten,
then place last grommet over pole. Attach the door hooks
over pole then attach the hooks to the canvas through
the small grommets then close the hooks. |
|
|
|
Attach Velcro
to top & bottom poles of Sukkah. |
|
 |
| |
Note:
Halacha requires
that 2 pieces of wood be placed on top of Sukkah
below the schach. |
|
|
| B
- (8) - (7'4") 88"poles. |
| C-
(4) - (9'3") 111" Poles. |
| D
- (1) - 6 Inch pole for door opening. |
| E
- (8) - Corner fittings. |
| H
- (1) - Cross fitting for door opening. |
| I
- (1) - Hex key. |
| J
- (1) - Canvas. |
|
|